|
|
|
Machine building plant" |
|
|
![]() |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
The Rigs is intended for realization current and overhaul, and as drilling of petroleum and gas chinks by depth of 1200-1600 meters. Structure of a complex includes elevating installation and pump installation QNQ2A-125. The complex is stipulated for works in moderate - cold climatic conditions. The elevating installation mounted on the chassis of the automobile ÊðÀÇ-65101 (for QK-80 - ÊðÀÇ-65053), is intended for descent-elevating works. Can be maintained on all kinds of roads, has high speeds of rise of a hook, due to use more powerful tractive of the engine of the automobile. The pump installation mounted on the chassis of the automobile ÊðÀÇ-65101, is intended for a forcing of a trade liquid through a column of boring pipes on chinks, and as for performance of various works on washing and will press through. Into a complete set of delivery enter: installation in the assembled kind, Documentation on ÃÎÑÒ 2.601 (maintenance instruction and data card), Spare parts according to the sheet Spare tools and accessories (including: press sector, stitches - in round, hoses brake, lamp, ring rubber condensation etc.).
|
![]() |
![]() |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||